Random Quote

It’s no longer a question of staying healthy. It’s a question of finding a sickness you like. — Jackie Mason, U.S. Comedian

Half Moon Bay-Pescadero Loop

|| Filed under: Events, default
August 30, 2008
8:30 amto1:30 pm

Start in Half Moon Bay at 8:30am.

Filed under: Length: 30 - 45 miles, Penninsula and South Bay, Rides, Terrain: 2000′ - 3000′

The inland route to Pescadero (and back).
Route A: 44 miles with 3,000 feet of climbing, round trip to Pescadero (light meal at Duartes or deli or bakery).
Route B: 20-25 miles, turn around at Tunitas Creek (or earlier).
Directions to starting point:
Get to Highway 92 (AKA: Hayward/San Mateo Bridge from East Bay).
Highway 92 West bound- follow signs to Half Moon Bay.
Once in Half Moon Bay, at 1st signal, turn RIGHT onto Main Street.
As Main Street veers to the left, turn LEFT into parking area in back of shopping center adjacent the car wash/gas station… bathroom available plus coffee, juice, water.

Half Moon Bay-Pescadero Route Map

HMB-Pescadero Girlie Map

Link to ride details and route maps.


Half Moon Bay/Pescadero loop

The inland route to Pescadero (and back).
Route A: 44 miles with 3,000 feet of climbing, round trip to Pescadero (light meal at Duartes or deli or bakery).
Route B: 20-25 miles, turn around at Tunitas Creek (or earlier).
Directions to starting point:
Get to Highway 92 (AKA: Hayward/San Mateo Bridge from East Bay).
Highway 92 West bound- follow signs to Half Moon Bay.
Once in Half Moon Bay, at 1st signal, turn RIGHT onto Main Street.
As Main Street veers to the left, turn LEFT into parking area in back of shopping center adjacent the car wash/gas station… bathroom available plus coffee, juice, water.

Half Moon Bay-Pescadero Route Map

HMB-Pescadero Girlie Map


Crissy Field (SF)/Alpine Dam Loop (featuring the 7 Itch-Bays)

|| Filed under: Events
June 21, 2008
8:30 amto2:30 pm

The Alpine Dam loop (featuring the 7 Itch-Bays). This is the clockwise direction. Start/end at Crissy Field, SF.
Route A: 53 miles with 3,900 feet of climbing. (add Mt. Tam summit: add 6 miles and 800 ft) Lunch stop in Fairfax after the climbing!
Route B: 22 miles with 1,000 feet of climbing, vanilla ride to end of bike path at Richardson Bay.
Route C: 42 miles with 2,000 feet of climbing- Tiburon/Paradise Drive Loop. Lunch at Shark Deli in Tiburon.

Link to ride details and route map.


Crissy Field (SF)/Alpine Dam Loop (clockwise)

The Alpine Dam loop (featuring the 7 Itch-Bays). This is the clockwise direction. Start/end at Crissy Field, SF.
Route A: 53 miles with 3,900 feet of climbing. (add Mt. Tam summit: add 6 miles and 800 ft) Lunch stop in Fairfax after the climbing!
Route B: 22 miles with 1,000 feet of climbing, vanilla ride to end of bike path at Richardson Bay.
Route C: 42 miles with 2,000 feet of climbing- Tiburon/Paradise Drive Loop. Lunch at Shark Deli in Tiburon.
Alpine Dam Route Map

Other Marin loops including Paradise Drive
Directions to the starting point (Crissy Field, SF):
From Oakland/East Bay-
a. 80 West over the SF / Oakland Bay Bridge.
b. In SF, take the 9th Street/Civic Center exit.
c. Going down the off ramp, tend to the RIGHT, go STRAIGHT onto Harrison.
d. Go one block and turn RIGHT onto 9th Street. Work your way to the left lane.
e. After crossing Market Street, turn LEFT onto Hayes Street.
f. One block after Van Ness Avenue, turn RIGHT onto Franklin Street.
g. Straight on Franklin Street until it ends… turn LEFT onto Bay Street.
h. Go three blocks, turn RIGHT onto Laguna Street.
i. Follow Laguna and it becomes Marina Blvd. as you tend LEFT at the famous Marina Safeway.
j. Continue on Marina Blvd., getting into the right lane. After the Yacht Harbor, DO NOT enter the freeway on-ramp to the GG Bridge, but…
k. Tend to the right and enter the Crissy Field/GGNRA.
l. After entering Crissy Field, take the first RIGHT and it will take you to the paved parking for the beach.
m. Unload your bike and continue with this adventure. Bathrooms and water at windsock.
From below SF-
1. 101 North.
2. Take the 7th Street exit and turn LEFT onto 7th
Street.
3. After going under the Freeway, turn LEFT onto Harrison Street.
4. Go two blocks and turn RIGHT onto 9th Street. Work your way to the left lane.
5. Follow the directions above beginning at “e”.


Crissy Field (SF) and various Marin Loops

|| Filed under: Events, default
August 2, 2008
8:30 amto1:30 pm

<> Meet at Crissy Field (SF) at  8:30am.
Link to ride information and Alpine Dam Route Map.

Route A: 53 miles with 3,900 feet of climbing. (Alpine Dam clockwise loop) Lunch stop in Fairfax after the climbing!
Route B: 22 miles with 1,000 feet of climbing, vanilla ride to end of bike path at Richardson Bay.
Route C: 42 miles with 2,000 feet of climbing- Tiburon/Paradise Drive Loop. Lunch at Shark Deli in Tiburon.