The Alpine Dam loop (featuring the 7 Itch-Bays). This is the clockwise direction. Start/end at Crissy Field, SF.
Route A: 53 miles with 3,900 feet of climbing. (add Mt. Tam summit: add 6 miles and 800 ft) Lunch stop in Fairfax after the climbing!
Route B: 22 miles with 1,000 feet of climbing, vanilla ride to end of bike path at Richardson Bay.
Route C: 42 miles with 2,000 feet of climbing- Tiburon/Paradise Drive Loop. Lunch at Shark Deli in Tiburon.
Crissy Field (SF)/Alpine Dam Loop (featuring the 7 Itch-Bays)
- Crissy Field (SF)/Alpine Dam Loop (clockwise)
- Half Moon Bay/Pescadero loop